Save your own copy
In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.
Your getting-started guide
Plan project tasks and see them across a twelve-week timeline.
Your first five minutes
Update the project name, lead, start, and target finish in the top amber cells.
See the fields in Project PlanReplace one task with its ID, phase, owner, dates, progress, status, budget, and actual cost.
See the fields in Project PlanReview the task bars and budget totals. Change task dates in Project Plan to move the bars.
See the fields in TimelineAmber: your entries. Type your information here.
Green: calculated results. Keep these formulas.
Status colors can change as you work. Use the field instructions below to confirm what you can edit.
Follow along in your copy
The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.
These are sample values. Replace or clear the amber example cells before relying on your totals.
Open the worksheet preview New to spreadsheets?
In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.
The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.
Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.
Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.
Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.
Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.
Keep this beside your workbook
A 12-week Gantt view linked to task dates, progress, owners, and budget. Read the results here. Update the source tabs to change them.
Follow the steps above for this view. Use its amber settings where shown, and keep calculated totals and charts in place.
Edit amber cells. Duration and budget variance calculate automatically. Editable cells begin at B4. Use the prepared amber rows for new records.
| Field and cells | What to do |
|---|---|
| Project (B4) | Replace this amber setting with your own value. Check the related dates and inputs when changing the period. |
| Start (E4) | Replace this amber setting with your own value. Check the related dates and inputs when changing the period. |
| Project lead (B5) | Replace this amber setting with your own value. Check the related dates and inputs when changing the period. |
| Target finish (E5) | Replace this amber setting with your own value. Check the related dates and inputs when changing the period. |
| ID A8:A27 | Replace the example with your own information for this record. |
| Phase B8:B27 | Replace the example with your own information for this record. |
| Task C8:C27 | Replace the example with your own information for this record. |
| Owner D8:D27 | Replace the example with your own information for this record. |
| Start E8:E27 | Enter the task start date. For a time-log row, enter a time such as 09:00. |
| End F8:F27 | Enter the end date for leave, or a time such as 17:30 in the time log. |
| % complete H8:H27 | Enter 0%, 50%, or 100%, for example. Update the task status separately. |
| Status I8:I27 | Replace the example with your own information for this record. Choose: Not started, In progress, Blocked, Done. |
| Budget J8:J27 | Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent. |
| Actual K8:K27 | Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent. |
Edit reusable labels for projects, owners, and task states. Editable cells begin at A7. Use the prepared amber rows for new records.
| Field and cells | What to do |
|---|---|
| Phase A7:A14 | Replace the example with your own information for this record. |
| Status B7:B14 | Replace the example with your own information for this record. |
| Owner C7:C14 | Replace the example with your own information for this record. |
Make it part of your routine
The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.
Dates are entered manually; changing a task does not reschedule dependencies. Enter progress as 50% for half complete.
Use the prepared amber area shown in the field notes. Before adding rows outside it, extend all formulas, dropdowns, charts, summaries, and any pivot source that uses that area.
Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.
Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.