Project Timeline Planner.

Plan project tasks and see them across a twelve-week timeline.

Your first five minutes

Make your first change.

  1. Open Project Plan

    Update the project name, lead, start, and target finish in the top amber cells.

    See the fields in Project Plan
  2. Open Project Plan

    Replace one task with its ID, phase, owner, dates, progress, status, budget, and actual cost.

    See the fields in Project Plan
  3. Open Timeline

    Review the task bars and budget totals. Change task dates in Project Plan to move the bars.

    See the fields in Timeline

Amber: your entries. Type your information here.

Green: calculated results. Keep these formulas.

Status colors can change as you work. Use the field instructions below to confirm what you can edit.

Follow along in your copy

Try the example in Project Plan.

The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.

A few cells to find

ProjectCell B4
Website relaunch
StartCell E4
Sep 21, 2026
Project leadCell B5
Avery Stone
Target finishCell E5
Dec 11, 2026
IDCell A8
1.1

These are sample values. Replace or clear the amber example cells before relying on your totals.

Project Timeline Planner: the Project Plan tab with illustrative sample dataOpen the worksheet preview
Project Plan. The download also includes a Start here instruction tab.

New to spreadsheets?

A few things that make it easier.

Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

Keep this beside your workbook

What goes where.

01

Timeline

A 12-week Gantt view linked to task dates, progress, owners, and budget. Read the results here. Update the source tabs to change them.

Follow the steps above for this view. Use its amber settings where shown, and keep calculated totals and charts in place.

02

Project Plan

Edit amber cells. Duration and budget variance calculate automatically. Editable cells begin at B4. Use the prepared amber rows for new records.

Fields in Project Plan. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Project (B4)Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
Start (E4)Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
Project lead (B5)Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
Target finish (E5)Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
ID A8:A27Replace the example with your own information for this record.
Phase B8:B27Replace the example with your own information for this record.
Task C8:C27Replace the example with your own information for this record.
Owner D8:D27Replace the example with your own information for this record.
Start E8:E27Enter the task start date. For a time-log row, enter a time such as 09:00.
End F8:F27Enter the end date for leave, or a time such as 17:30 in the time log.
% complete H8:H27Enter 0%, 50%, or 100%, for example. Update the task status separately.
Status I8:I27Replace the example with your own information for this record. Choose: Not started, In progress, Blocked, Done.
Budget J8:J27Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
Actual K8:K27Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
03

Lists

Edit reusable labels for projects, owners, and task states. Editable cells begin at A7. Use the prepared amber rows for new records.

Fields in Lists. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Phase A7:A14Replace the example with your own information for this record.
Status B7:B14Replace the example with your own information for this record.
Owner C7:C14Replace the example with your own information for this record.

Make it part of your routine

Everyday use & common fixes.

Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

What to check

Dates are entered manually; changing a task does not reschedule dependencies. Enter progress as 50% for half complete.

More records

Use the prepared amber area shown in the field notes. Before adding rows outside it, extend all formulas, dropdowns, charts, summaries, and any pivot source that uses that area.

Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.