# How to use Bill of Materials & Batch Costing

Build a single-level bill of materials from reusable part prices. Enter a batch quantity, include a scrap allowance, and compare material, labor, overhead, and total batch cost before starting production.

Guide: https://gridmori.com/guides/bill-of-materials-costing

## Make your first change

1. Open **Parts**. Replace examples in A8:F107. Each part needs a unique code, unit cost, and Whole or Fractional issue policy.
2. Open **Assembly**. Set the assembly and revision in B4:B5, costing date in B6, batch quantity in B7, and per-unit labor/overhead in B8:B9. Replace component inputs in rows 14–63.
3. Open **Revisions**. Save a dated workbook copy before changing prices or design. Record the revision and reason in the manual history, then review cost and input warnings.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Assembly

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Assembly (B4): Desk organizer
- Revision (B5): R1
- Costing date (B6): Oct 29, 2026
- Batch quantity (B7): 10
- Labor per unit (B8): $8.00

## Spreadsheet basics

### Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

### Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

### Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

### Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

### Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

## Use this template well

### Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

### Prepared capacity

One single-level assembly, 50 component lines, 100 parts, and 20 revision entries. USD. No nested subassembly expansion, live prices, inventory depletion, purchasing automation, or saved-revision snapshots.

### Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read missing-input messages before using a result.

### More records

Beyond prepared capacity, extend formulas, validation, summary ranges, and chart ranges together.

## Tabs and fields

### Assembly

Set the product revision and batch size; enter component quantities and review batch cost.

- **Assembly (B4)**: Product or assembly being costed. One assembly per saved workbook.
- **Revision (B5)**: Design revision represented by the current component list.
- **Costing date (B6)**: Date these prices and assumptions were reviewed.
- **Batch quantity (B7)**: Positive whole number of finished assemblies to make.
- **Labor per unit (B8)**: USD labor allowance per finished assembly; enter 0 for none.
- **Overhead per unit (B9)**: USD overhead allowance per finished assembly; enter 0 for none.
- **Component code (A14)**: Choose a unique part code from Parts. Repeated component lines are allowed and sum into cost.
- **Quantity per assembly (D14)**: Nominal component requirement before the scrap allowance.
- **Scrap allowance (E14)**: Extra quantity as a percentage of nominal quantity, not a yield-loss denominator.
- **Required for batch (F14)**: Nominal quantity × (1 + allowance) × batch size. Whole issue policy rounds up after multiplying the batch.

### Parts

Maintain 100 unique part codes, descriptions, units, prices, issue policies, and suppliers.

- **Part code (A8)**: Unique identifier. Duplicate codes flag every matching row.
- **Description (B8)**: Name shown in the assembly list.
- **Unit (C8)**: Unit in which quantity and price are expressed, such as each, m, or kg.
- **Unit cost (D8)**: Nonnegative USD per listed unit; enter 0 for a confirmed free part.
- **Issue policy (E8)**: Whole rounds batch requirements up to an integer; Fractional retains decimal quantity.
- **Supplier (F8)**: Optional supplier or source reference.

### Revisions

Record 20 dated revisions manually; this is a history log, not an automatic snapshot archive.

- **Revision (A8)**: Unique revision reference.
- **Date (B8)**: Date of the change.
- **Changed by (C8)**: Person responsible for the revision.
- **Reason (D8)**: Describe what changed and why.

Return to the Start here tab inside the workbook whenever you need these instructions.