# How to use Budget Variance Analysis

Enter one row per department, category, and month with both budget and actual expense. Positive variance means overspend; negative variance means underspend.

Guide: https://gridmori.com/guides/budget-variance-pivot

## Make your first change

1. Open **Overview**. Replace the four department names in A8:A11. Review amounts in USD.
2. Open **Budget lines**. Replace examples in rows 8–87. Use one row per department/category/month; both budget and actual are required, including confirmed zeroes.
3. Open **Variance pivot**. Choose Data > Refresh All in Excel. Review positive overspends and negative underspends, then reconcile to the live variance total.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Budget lines

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Month date (A8): Aug 01, 2026
- Department (B8): Engineering
- Category (C8): Services
- Budget (D8): $1,000.00
- Actual (E8): $900.00

## Spreadsheet basics

### Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

### Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

### Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

### Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

### Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

## Use this template well

### Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

### Prepared capacity

80 operating expense lines, four dashboard departments, one currency. No general ledger import, accrual calculation, revenue planning, or multi-currency conversion. Refresh pivots after edits.

### Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read any missing-input messages before using a result.

### More records

Beyond prepared capacity, extend formulas, dropdowns, chart and summary ranges, and any pivot source range.

## Tabs and fields

### Overview

Compare total budget and actuals by department, including unmapped department warnings.


### Variance pivot

Refresh the native pivot to regroup signed variances by department and category.


### Budget lines

Enter monthly budget and actual operating expense for the same scope.

- **Month date (A8)**: Enter month date for this record. Use the units and reporting period in the heading.
- **Department (B8)**: Calculated field. Keep the formula.
- **Category (C8)**: Enter category for this record. Use the units and reporting period in the heading.
- **Budget (D8)**: Enter budget for this record. Use the units and reporting period in the heading.
- **Actual (E8)**: Enter actual for this record. Use the units and reporting period in the heading.
- **Variance (F8)**: Calculated field. Keep the formula.
- **Input check (G8)**: Calculated field. Keep the formula.

Return to the Start here tab inside the workbook whenever you need these instructions.
