# How to use Event Planning and Budget

Track event costs and the tasks needed to make the event happen.

Guide: https://gridmori.com/guides/event-planning-budget

## Make your first change

1. Open **Budget**. Replace one item with your vendor, planned budget, committed cost, actual cost, and payment status.
2. Open **Task Plan**. Add the event work with an owner, start date, due date, priority, and status.
3. Open **Dashboard**. Review budget, committed and actual spend, and open tasks together.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Task Plan

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Task (A7): Confirm venue
- Workstream (B7): Venue
- Owner (C7): Mina
- Start (D7): Sep 01, 2026
- Due (E7): Sep 10, 2026

## Spreadsheet basics

### Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

### Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

### Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

### Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

### Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

## Use this template well

### Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

### What to check

Committed is the amount you have agreed to spend. Actual is what has been incurred so far. Keep them in their separate columns.

### More records

Use the prepared amber area shown in the field notes. Before adding rows outside it, extend all formulas, dropdowns, charts, summaries, and any pivot source that uses that area.

### Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

### If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.

## Tabs and fields

### Dashboard

Keep the run-up, vendors, committed spend, actual cost, and remaining work visible. Read the results here. Update the source tabs to change them.


### Budget

Record planned, committed, and actual costs by vendor. Variance and payment status stay visible. Editable cells begin at A7. Use the prepared amber rows for new records.

- **Item A7:A36**: Replace the example with your own information for this record.
- **Category B7:B36**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it. Choose: Venue, Catering, Production, Marketing, Travel, Contingency.
- **Vendor C7:C36**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
- **Budget D7:D36**: Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
- **Committed E7:E36**: Enter the cost already agreed with the vendor for this item.
- **Actual F7:F36**: Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
- **Payment status H7:H36**: Replace the example with your own information for this record.
- **Owner I7:I36**: Replace the example with your own information for this record.
- **Notes J7:J36**: Write a short, specific description that another person can act on or check.

### Task Plan

Track every event task with owner, due date, priority, and status. Editable cells begin at A7. Use the prepared amber rows for new records.

- **Task A7:A46**: Replace the example with your own information for this record.
- **Workstream B7:B46**: Replace the example with your own information for this record.
- **Owner C7:C46**: Replace the example with your own information for this record.
- **Start D7:D46**: Enter the task start date. For a time-log row, enter a time such as 09:00.
- **Due E7:E46**: Enter a real date such as 11/06/2026. Use the same reporting period as the rest of the record.
- **Priority F7:F46**: Replace the example with your own information for this record. Choose: High, Medium, Low.
- **Status G7:G46**: Replace the example with your own information for this record. Choose: Not started, In progress, At risk, Complete.
- **Notes I7:I46**: Write a short, specific description that another person can act on or check.

Return to the Start here tab inside the workbook whenever you need these instructions.