# How to use OKR Progress Tracker

Keep key-result owners, baselines, targets, and current values together. A formula-driven review groups results by objective and highlights incomplete inputs.

Guide: https://gridmori.com/guides/okr-progress-tracker

## Make your first change

1. Open **Review**. Replace the four objective names in A8:A11. Use those exact names in Key results.
2. Open **Key results**. Change F8 from 140 to 175. The first result reaches 75% of the path from baseline 100 to target 200.
3. Open **Review**. Resolve Review inputs messages and discuss the progress with owners. Progress is not a forecast or a time-based on-track status.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Key results

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Objective (A8): Growth
- Key result (B8): Qualified leads
- Owner (C8): Alex
- Baseline (D8): 100
- Target (E8): 200

## Spreadsheet basics

### Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

### Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

### Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

### Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

### Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

## Use this template well

### Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

### Prepared capacity

30 key results and four objectives. Equal-weight averages; no weighted scoring, time-based forecast, reminders, or task integrations. Progress can be negative or exceed 100%.

### Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read missing-input messages before using a result.

### More records

Beyond prepared capacity, extend formulas, validation, summary ranges, and chart ranges together.

## Tabs and fields

### Review

Set four objective names and compare the equal-weight average progress of their key results.

- **Objective (A8)**: Use four distinct nonblank names. Match them exactly in Key results.
- **Key results (B8)**: Number of entered key results assigned to this objective.
- **Average progress (C8)**: Equal weight per key result; incomplete results flag the objective.

### Key results

Enter owners and numeric baselines, targets, current values, and direction.

- **Objective (A8)**: Use one of the four objective names on Review.
- **Key result (B8)**: Describe a measurable outcome.
- **Owner (C8)**: Name the accountable person.
- **Baseline (D8)**: Starting numeric value in the metric’s own units.
- **Target (E8)**: Higher than baseline for Increase, lower for Decrease.
- **Current (F8)**: Latest measurement in the same units.
- **Direction (G8)**: Choose Increase or Decrease.

Return to the Start here tab inside the workbook whenever you need these instructions.