# How to use Project Cost and Profitability Tracker

Compare project contract value and budget with recorded costs.

Guide: https://gridmori.com/guides/project-cost-profitability-tracker

## Make your first change

1. Open **Projects**. Enter a project ID, project name, client, contract value, and cost budget.
2. Open **Cost Log**. Record a dated cost and amount using the exact project name from Projects.
3. Open **Dashboard**. Review remaining budgets and gross profit. Check the Cost Log when a total looks unexpected.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Cost Log

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Date (A7): Sep 28, 2026
- Project (B7): Atlas launch
- Category (C7): Labor
- Description (D7): Discovery and planning
- Vendor / person (E7): Internal team

## Spreadsheet basics

### Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

### Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

### Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

### Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

### Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

## Use this template well

### Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

### What to check

A project cost is recorded once. Project names connect the two tabs, so update both if you rename a project.

### More records

Use the prepared amber area shown in the field notes. Before adding rows outside it, extend all formulas, dropdowns, charts, summaries, and any pivot source that uses that area.

### Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

### If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.

## Tabs and fields

### Dashboard

See project budgets, actual costs, remaining budget, and gross margin in one view. Read the results here. Update the source tabs to change them.


### Projects

Enter project terms. Cost, remaining budget, profit, margin, and status update from the cost log. Editable cells begin at A7. Use the prepared amber rows for new records.

- **Project ID A7:A26**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
- **Project B7:B26**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
- **Client C7:C26**: Replace the example with your own information for this record.
- **Contract value D7:D26**: Replace the example with your own information for this record.
- **Cost budget E7:E26**: Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.

### Cost Log

Record labor, contractor, software, travel, and materials against each project. Editable cells begin at A7. Use the prepared amber rows for new records.

- **Date A7:A46**: Enter a real date such as 11/06/2026. Use the same reporting period as the rest of the record.
- **Project B7:B46**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it. Use the dropdown choices from Projects!B7:B26.
- **Category C7:C46**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
- **Description D7:D46**: Write a short, specific description that another person can act on or check.
- **Vendor / person E7:E46**: Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
- **Amount F7:F46**: Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
- **Billable G7:G46**: Replace the example with your own information for this record. Choose: Yes, No.
- **Approved H7:H46**: Replace the example with your own information for this record. Choose: Yes, Pending, No.

Return to the Start here tab inside the workbook whenever you need these instructions.