# How to use Project Risk Register

Use a compact register to make uncertainty discussable. Keep a short description of each risk or issue, record the person responsible for reviewing it, and agree on a response that can be checked at the next project review.

Guide: https://gridmori.com/guides/project-risk-register

## Make your first change

1. Open **Team worksheet**. Update the context in A4 with your team, project, or review period.
2. Open **Team worksheet**. Replace the example in row 10 with your own risk / issue. Fill the amber cells across that row.
3. Open **Team worksheet**. Review open items regularly and update the status when a response changes the risk.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Team worksheet

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Context (A4): Project: Autumn launch | Review date: October 29, 2026 | Fictional sample data
- Risk / issue (A10): Risk: supplier delay affects launch
- Owner (B10): Robin
- Likelihood (C10): Medium
- Impact (D10): High

## Spreadsheet basics

### Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

### Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

### Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

### Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

### Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

## Use this template well

### Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

### What to check

Use likelihood for future risks. For an issue that has already happened, describe the current impact and required response instead of pretending it is still uncertain.

### Your workflow

Describe each risk as a possible event and consequence, or label an active issue clearly. Choose likelihood and impact using your team's shared definitions, then assign an owner and response. Review open items regularly and update the status when a response changes the risk.

### What this does

No. The 20-row register records your team's qualitative ratings and responses. It does not calculate a probability, detect risks, enforce a risk framework, or send alerts.

### Prepared rows

Use rows 10–29 for up to 20 records. For more, extend the formulas, dropdowns, and summary ranges. A copied row alone does not extend every summary.

### Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

### If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.

## Tabs and fields

### Team worksheet

Ratings are qualitative discussion inputs. No numeric risk score or automatic recommendation is calculated. Editable cells begin at A4. Use the prepared amber rows for new records.

- **Context (A4)**: Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
- **Risk / issue A10:A29**: Replace the example with your own information for this record.
- **Owner B10:B29**: Replace the example with your own information for this record.
- **Likelihood C10:C29**: Replace the example with your own information for this record. Choose: Low, Medium, High.
- **Impact D10:D29**: Replace the example with your own information for this record. Choose: Low, Medium, High.
- **Status E10:E29**: Replace the example with your own information for this record. Choose: Open, Watching, Mitigated, Closed.
- **Response / next step F10:F29**: Write a short, specific description that another person can act on or check.

Return to the Start here tab inside the workbook whenever you need these instructions.