# How to use Quarterly Roadmap

A roadmap should help a team see where it is going. This lightweight quarterly plan keeps the focus on initiatives and outcomes, with a month-by-month milestone field and a simple view of progress.

Guide: https://gridmori.com/guides/quarterly-roadmap

## Make your first change

1. Open **Team worksheet**. Update the context in A4 with your team, project, or review period.
2. Open **Team worksheet**. Replace the example in row 10 with your own initiative. Fill the amber cells across that row.
3. Open **Team worksheet**. Revisit the roadmap monthly, updating progress and discussing anything At risk.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Team worksheet

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Context (A4): Quarter: October-December 2026 | Example team: Northstar Studio
- Initiative (A10): Customer listening
- Owner (B10): Jamie
- Month (C10): October
- Milestone (D10): Interview themes shared

## Spreadsheet basics

### Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

### Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

### Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

### Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

### Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

## Use this template well

### Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

### What to check

Keep dates at the level you can confidently commit to. A month and a meaningful milestone are often enough.

### Your workflow

Name the quarter in the context line and add your team's intended outcomes. Set an owner and a month or milestone for each initiative. Revisit the roadmap monthly, updating progress and discussing anything At risk.

### What this does

Yes. The quarter label and month fields are editable text, so you can use your team's fiscal quarter or any three-month period. This is an initiative roadmap, with no automatic date scheduling.

### Prepared rows

Use rows 10–29 for up to 20 records. For more, extend the formulas, dropdowns, and summary ranges. A copied row alone does not extend every summary.

### Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

### If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.

## Tabs and fields

### Team worksheet

Set your quarter in A4. Pale yellow cells are editable; green cells calculate automatically. Editable cells begin at A4. Use the prepared amber rows for new records.

- **Context (A4)**: Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
- **Initiative A10:A29**: Replace the example with your own information for this record.
- **Owner B10:B29**: Replace the example with your own information for this record.
- **Month C10:C29**: Replace the example with your own information for this record.
- **Milestone D10:D29**: Replace the example with your own information for this record.
- **Status E10:E29**: Replace the example with your own information for this record. Choose: Planned, In progress, Delivered, At risk.
- **Intended outcome F10:F29**: Write a short, specific description that another person can act on or check.

Return to the Start here tab inside the workbook whenever you need these instructions.
