# How to use Property Renovation Budget

Track a single property renovation from line-item estimates to actual spend. Phase totals expose overruns, and the contingency stays separate from the base estimate.

Guide: https://gridmori.com/guides/renovation-budget-planner

## Make your first change

1. Open **Costs**. Replace the fictional items in rows 8–47. Choose a phase, enter quantities and rates, and record actual spend.
2. Open **Costs**. Change the first item’s actual spend in F8 from 1100 to 1500. Its overrun rises by $400.
3. Open **Overview**. Set contingency in B5. Missing amounts flag the overview; enter 0 for confirmed no spend.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Costs

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Phase (A8): Preparation
- Item (B8): Survey and permits
- Quantity (C8): 1
- Planned rate (D8): $1,000.00
- Owner (E8): Alex

## Spreadsheet basics

### Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

### Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

### Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

### Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

### Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

## Use this template well

### Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

### Prepared capacity

40 line items for one property and four fixed phases. Manual cost entry; no contractor payments, tax engine, schedule, or accounting sync.

### Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read missing-input messages before using a result.

### More records

Beyond prepared capacity, extend formulas, validation, summary ranges, and chart ranges together.

## Tabs and fields

### Overview

Review phase totals, base estimate, contingency, approved budget, and remaining budget.

- **Property (B4)**: Enter the project’s property name.
- **Contingency rate (B5)**: Allowance applied to the base estimate, separate from actual spend.
- **Actual spend (C8)**: Sums recorded spend for each phase only when inputs are complete.

### Costs

Enter quantity, estimated rate, actual spend, and owner for 40 items.

- **Phase (A8)**: Choose Preparation, Interior, Exterior, or Finishing.
- **Item (B8)**: Describe the work or purchase.
- **Quantity (C8)**: Use a nonnegative quantity.
- **Planned rate (D8)**: Estimated USD per unit.
- **Owner (E8)**: Person responsible for this cost item.
- **Actual spend (F8)**: Total recorded spend in USD; enter 0 for confirmed zero.

Return to the Start here tab inside the workbook whenever you need these instructions.