# How to use SIPOC Process Map

Agree the start and end of a process, its suppliers and inputs, its major steps, and the outputs customers need.

Guide: https://gridmori.com/guides/sipoc-process-map

## Make your first change

1. Open **SIPOC**. Set the process name, owner, start trigger, and end point in the amber fields.
2. Open **Requirements**. Replace the examples in rows 8–19 with measurable input or output requirements, owners, and actions.
3. Open **SIPOC**. Review all five lists with people who do the work. Keep the process at a high level.

Amber cells accept your entries. Green cells contain calculated results. Keep formulas, headings, and chart cells.

## Follow the example in Requirements

These are illustrative values already in the workbook. Save a copy, try one change, and then replace the examples with your own information.

- Type (A8): Input
- Input / output (B8): Accepted order
- Acceptance criterion (C8): All mandatory fields complete

## Spreadsheet basics

### Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

### Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

### Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

### Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

### Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

### Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

## Use this template well

### Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

### Prepared capacity

Seven prepared entries per SIPOC column and 12 requirement rows. A high-level process definition, without workflow automation or detailed flowchart connectors.

### Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read any missing-input messages before using a result.

### More records

Beyond prepared capacity, extend formulas, dropdowns, chart and summary ranges, and any pivot source range.

### Framework source

https://asq.org/quality-resources/articles/sipoc-job-aid?id=232019f796fc447dad7cdb2cf242f48a

## Tabs and fields

### SIPOC

Define the boundaries and edit each of the five lists independently. Rows do not imply one-to-one relationships.

- **Process (B5)**: Give the process a specific name.
- **Owner (D5)**: Assign the person accountable for maintaining the map.
- **Start trigger (B6)**: State what causes the process to begin.
- **End point (D6)**: State when the process is finished.
- **Suppliers (A9)**: List organizations or people supplying inputs.
- **Process steps (C9)**: Keep the main process to five to seven high-level steps.

### Requirements

Define measurable acceptance criteria and follow-up actions for important inputs and outputs.

- **Type (A8)**: Choose Input or Output.
- **Input / output (B8)**: Use a label from the map.
- **Acceptance criterion (C8)**: State a measurable requirement.

Return to the Start here tab inside the workbook whenever you need these instructions.
