Budget Variance Analysis.

Enter one row per department, category, and month with both budget and actual expense. Positive variance means overspend; negative variance means underspend.

Your first five minutes

Make your first change.

  1. Open Overview

    Replace the four department names in A8:A11. Review amounts in USD.

    See the fields in Overview
  2. Open Budget lines

    Replace examples in rows 8–87. Use one row per department/category/month; both budget and actual are required, including confirmed zeroes.

    See the fields in Budget lines
  3. Open Variance pivot

    Choose Data > Refresh All in Excel. Review positive overspends and negative underspends, then reconcile to the live variance total.

    See the fields in Variance pivot

Amber: your entries. Type your information here.

Green: calculated results. Keep these formulas.

Status colors can change as you work. Use the field instructions below to confirm what you can edit.

Follow along in your copy

Try the example in Budget lines.

The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.

A few cells to find

Month dateCell A8
Aug 01, 2026
DepartmentCell B8
Engineering
CategoryCell C8
Services
BudgetCell D8
$1,000.00
ActualCell E8
$900.00

These are sample values. Replace or clear the amber example cells before relying on your totals.

Budget Variance Analysis: the Budget lines tab with illustrative sample dataOpen the worksheet preview
Budget lines. The download also includes a Start here instruction tab.

New to spreadsheets?

A few things that make it easier.

Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

Keep this beside your workbook

What goes where.

01

Overview

Compare total budget and actuals by department, including unmapped department warnings.

Follow the steps above for this view. Use its amber settings where shown, and keep calculated totals and charts in place.

02

Variance pivot

Refresh the native pivot to regroup signed variances by department and category.

Follow the steps above for this view. Use its amber settings where shown, and keep calculated totals and charts in place. Refresh the pivot after editing its source data.

03

Budget lines

Enter monthly budget and actual operating expense for the same scope.

Fields in Budget lines. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Month date (A8)Enter month date for this record. Use the units and reporting period in the heading.
Department (B8)Calculated field. Keep the formula.
Category (C8)Enter category for this record. Use the units and reporting period in the heading.
Budget (D8)Enter budget for this record. Use the units and reporting period in the heading.
Actual (E8)Enter actual for this record. Use the units and reporting period in the heading.
Variance (F8)Calculated field. Keep the formula.
Input check (G8)Calculated field. Keep the formula.

Make it part of your routine

Everyday use & common fixes.

Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

Prepared capacity

80 operating expense lines, four dashboard departments, one currency. No general ledger import, accrual calculation, revenue planning, or multi-currency conversion. Refresh pivots after edits.

Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read any missing-input messages before using a result.

More records

Beyond prepared capacity, extend formulas, dropdowns, chart and summary ranges, and any pivot source range.