All spreadsheet guides

Your getting-started guide

How to use
Launch Gantt planner.

Plan launch tasks across eight weeks and review planned hours by owner.

Your first five minutes

Make your first change.

  1. Open Tasks

    Replace the first task with a unique ID, name, owner, start, finish, progress, hours, and status.

    See the fields in Tasks
  2. Open Timeline

    Set First week in B4 to your starting Monday. Date edits in Tasks move the weekly bars.

    See the fields in Timeline
  3. Open Workload

    In desktop Excel, choose Data > Refresh All after edits to update the planned-hours pivot.

    See the fields in Workload

Amber: your entries. Type your information here.

Green: calculated results. Keep these formulas.

Status colors can change as you work. Use the field instructions below to confirm what you can edit.

Follow along in your copy

Try the example in Tasks.

The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.

A few cells to find

Task IDCell A8
L01
TaskCell B8
Confirm launch brief
OwnerCell C8
Alex
StartCell D8
Oct 29, 2026
FinishCell E8
Nov 04, 2026

These are sample values. Replace or clear the amber example cells before relying on your totals.

Launch Gantt planner: the Tasks tab with illustrative sample dataOpen the worksheet preview
Tasks. The download also includes a Start here instruction tab.

New to spreadsheets?

A few things that make it easier.

Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

Keep this beside your workbook

What goes where.

01

Timeline

Change first week in B4. Each cell represents a full week, including partial overlaps. Editable cells begin at B4. Replace the examples with your information.

Fields in Timeline. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
First week (B4)Replace this amber setting with your own value. Check the related dates and inputs when changing the period.
02

Tasks

Fictional examples. Dates are manual. Amber cells are inputs; green cells calculate. Editable cells begin at A8. Use the prepared amber rows for new records.

Fields in Tasks. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Task ID A8:A37Give each task its own stable code, such as T01. Keep it unique.
Task B8:B37Replace the example with your own information for this record.
Owner C8:C37Replace the example with your own information for this record.
Start D8:D37Enter the task start date. For a time-log row, enter a time such as 09:00.
Finish E8:E37Enter a real date such as 11/06/2026. Use the same reporting period as the rest of the record.
Progress F8:F37Enter 0%, 50%, or 100%, for example. This describes how much of the work is complete.
Planned hours G8:G37Enter total hours of planned effort for the task. This is not remaining or weekly capacity.
Status H8:H37Replace the example with your own information for this record. Choose: Planned, Doing, Done.
03

Workload

Refresh after task edits. Total planned hours, not weekly capacity or remaining hours. Read the results here. Update the source tabs to change them.

Follow the steps above for this view. Use its amber settings where shown, and keep calculated totals and charts in place. Refresh the pivot after editing its source data.

Make it part of your routine

Everyday use & common fixes.

Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

What to check

Tasks has 30 prepared rows (8–37). Timeline updates live; Workload needs a pivot refresh. Hours are total planned effort, not weekly capacity.

More records

Use the prepared amber area shown in the field notes. Before adding rows outside it, extend all formulas, dropdowns, charts, summaries, and any pivot source that uses that area.

Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.