Project Cost and Profitability Tracker.

Compare project contract value and budget with recorded costs.

Your first five minutes

Make your first change.

  1. Open Projects

    Enter a project ID, project name, client, contract value, and cost budget.

    See the fields in Projects
  2. Open Cost Log

    Record a dated cost and amount using the exact project name from Projects.

    See the fields in Cost Log
  3. Open Dashboard

    Review remaining budgets and gross profit. Check the Cost Log when a total looks unexpected.

    See the fields in Dashboard

Amber: your entries. Type your information here.

Green: calculated results. Keep these formulas.

Status colors can change as you work. Use the field instructions below to confirm what you can edit.

Follow along in your copy

Try the example in Cost Log.

The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.

A few cells to find

DateCell A7
Sep 28, 2026
ProjectCell B7
Atlas launch
CategoryCell C7
Labor
DescriptionCell D7
Discovery and planning
Vendor / personCell E7
Internal team

These are sample values. Replace or clear the amber example cells before relying on your totals.

Project Cost and Profitability Tracker: the Cost Log tab with illustrative sample dataOpen the worksheet preview
Cost Log. The download also includes a Start here instruction tab.

New to spreadsheets?

A few things that make it easier.

Save your own copy

In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.

Tabs and cells

The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.

Type and move

Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.

Choose a dropdown

Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.

Dates and amounts

Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.

Undo a mistake

Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.

Keep this beside your workbook

What goes where.

01

Dashboard

See project budgets, actual costs, remaining budget, and gross margin in one view. Read the results here. Update the source tabs to change them.

Follow the steps above for this view. Use its amber settings where shown, and keep calculated totals and charts in place.

02

Projects

Enter project terms. Cost, remaining budget, profit, margin, and status update from the cost log. Editable cells begin at A7. Use the prepared amber rows for new records.

Fields in Projects. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Project ID A7:A26Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
Project B7:B26Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
Client C7:C26Replace the example with your own information for this record.
Contract value D7:D26Replace the example with your own information for this record.
Cost budget E7:E26Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
03

Cost Log

Record labor, contractor, software, travel, and materials against each project. Editable cells begin at A7. Use the prepared amber rows for new records.

Fields in Cost Log. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Date A7:A46Enter a real date such as 11/06/2026. Use the same reporting period as the rest of the record.
Project B7:B46Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it. Use the dropdown choices from Projects!B7:B26.
Category C7:C46Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
Description D7:D46Write a short, specific description that another person can act on or check.
Vendor / person E7:E46Enter the name or label for this record. Use exactly the same spelling on other tabs that refer to it.
Amount F7:F46Enter a numeric value in the units shown by the heading. Use the example format and keep the period consistent.
Billable G7:G46Replace the example with your own information for this record. Choose: Yes, No.
Approved H7:H46Replace the example with your own information for this record. Choose: Yes, Pending, No.

Make it part of your routine

Everyday use & common fixes.

Before using your data

The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.

What to check

A project cost is recorded once. Project names connect the two tabs, so update both if you rename a project.

More records

Use the prepared amber area shown in the field notes. Before adding rows outside it, extend all formulas, dropdowns, charts, summaries, and any pivot source that uses that area.

Blank or zero?

Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.

If a result looks wrong

Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.