Your getting-started guide
Use a compact register to make uncertainty discussable. Keep a short description of each risk or issue, record the person responsible for reviewing it, and agree on a response that can be checked at the next project review.
Your first five minutes
Update the context in A4 with your team, project, or review period.
See the fields in Team worksheetReplace the example in row 10 with your own risk / issue. Fill the amber cells across that row.
See the fields in Team worksheetReview open items regularly and update the status when a response changes the risk.
See the fields in Team worksheetAmber: your entries. Type your information here.
Green: calculated results. Keep these formulas.
Status colors can change as you work. Use the field instructions below to confirm what you can edit.
Follow along in your copy
The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.
These are sample values. Replace or clear the amber example cells before relying on your totals.

New to spreadsheets?
In Excel, use File > Save As and give your copy a name. Save again after making changes. Keep a fresh original for next time.
The names along the bottom are tabs. Click one to open it. A cell is one box: B7 means column B, row 7.
Click an amber cell, type, and press Enter. Press Tab to move right. Double-click a cell to edit part of its text.
Click a cell with a dropdown, then click its small arrow and choose a listed option. The field notes list the available choices.
Enter dates such as 11/06/2026 and amounts as numbers, such as 1250. Enter 50% for half. Keep the existing number formats.
Press Ctrl+Z on Windows or Command+Z on Mac immediately after a mistake. A formula starts with = in the formula bar; keep it in place.
Keep this beside your workbook
Ratings are qualitative discussion inputs. No numeric risk score or automatic recommendation is calculated. Editable cells begin at A4. Use the prepared amber rows for new records.
| Field and cells | What to do |
|---|---|
| Context (A4) | Replace this amber setting with your own value. Check the related dates and inputs when changing the period. |
| Risk / issue A10:A29 | Replace the example with your own information for this record. |
| Owner B10:B29 | Replace the example with your own information for this record. |
| Likelihood C10:C29 | Replace the example with your own information for this record. Choose: Low, Medium, High. |
| Impact D10:D29 | Replace the example with your own information for this record. Choose: Low, Medium, High. |
| Status E10:E29 | Replace the example with your own information for this record. Choose: Open, Watching, Mitigated, Closed. |
| Response / next step F10:F29 | Write a short, specific description that another person can act on or check. |
Make it part of your routine
The filled rows are examples. Replace or clear their amber input cells so sample records do not stay in your totals. Keep formulas and headings.
Use likelihood for future risks. For an issue that has already happened, describe the current impact and required response instead of pretending it is still uncertain.
Describe each risk as a possible event and consequence, or label an active issue clearly. Choose likelihood and impact using your team's shared definitions, then assign an owner and response. Review open items regularly and update the status when a response changes the risk.
No. The 20-row register records your team's qualitative ratings and responses. It does not calculate a probability, detect risks, enforce a risk framework, or send alerts.
Use rows 10–29 for up to 20 records. For more, extend the formulas, dropdowns, and summary ranges. A copied row alone does not extend every summary.
Leave an unknown value blank. Enter 0 when you have confirmed there is none. If you see Complete inputs or Add dates, fill the missing source fields first.
Check for leftover example rows, missing dates or amounts, mismatched names, and text entered instead of numbers. If a formula was replaced, Undo or copy it from a fresh original.