Property Renovation Budget.

Track a single property renovation from line-item estimates to actual spend. Phase totals expose overruns, and the contingency stays separate from the base estimate.

Your first five minutes

Make your first change.

  1. Open Costs

    Replace the fictional items in rows 8–47. Choose a phase, enter quantities and rates, and record actual spend.

    See the fields in Costs
  2. Open Costs

    Change the first item’s actual spend in F8 from 1100 to 1500. Its overrun rises by $400.

    See the fields in Costs
  3. Open Overview

    Set contingency in B5. Missing amounts flag the overview; enter 0 for confirmed no spend.

    See the fields in Overview

Amber: your entries. Type your information here.

Green: calculated results. Keep these formulas.

Status colors can change as you work. Use the field instructions below to confirm what you can edit.

Follow along in your copy

Try the example in Costs.

The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.

A few cells to find

PhaseCell A8
Preparation
ItemCell B8
Survey and permits
QuantityCell C8
1
Planned rateCell D8
$1,000.00
OwnerCell E8
Alex

These are sample values. Replace or clear the amber example cells before relying on your totals.

Property Renovation Budget: the Costs tab with illustrative sample dataOpen the worksheet preview
Costs. The download also includes a Start here instruction tab.

New to spreadsheets?

A few things that make it easier.

Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

Keep this beside your workbook

What goes where.

01

Overview

Review phase totals, base estimate, contingency, approved budget, and remaining budget.

Fields in Overview. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Property (B4)Enter the project’s property name.
Contingency rate (B5)Allowance applied to the base estimate, separate from actual spend.
Actual spend (C8)Sums recorded spend for each phase only when inputs are complete.
02

Costs

Enter quantity, estimated rate, actual spend, and owner for 40 items.

Fields in Costs. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Phase (A8)Choose Preparation, Interior, Exterior, or Finishing.
Item (B8)Describe the work or purchase.
Quantity (C8)Use a nonnegative quantity.
Planned rate (D8)Estimated USD per unit.
Owner (E8)Person responsible for this cost item.
Actual spend (F8)Total recorded spend in USD; enter 0 for confirmed zero.

Make it part of your routine

Everyday use & common fixes.

Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

Prepared capacity

40 line items for one property and four fixed phases. Manual cost entry; no contractor payments, tax engine, schedule, or accounting sync.

Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read missing-input messages before using a result.

More records

Beyond prepared capacity, extend formulas, validation, summary ranges, and chart ranges together.