Skip to content
GRID/MORI
Bag0
All spreadsheet guides

Your getting-started guide

How to use
Bill of Materials & Batch Costing.

Build a single-level bill of materials from reusable part prices. Enter a batch quantity, include a scrap allowance, and compare material, labor, overhead, and total batch cost before starting production.

Your first five minutes

Make your first change.

  1. Open Parts

    Replace examples in A8:F107. Each part needs a unique code, unit cost, and Whole or Fractional issue policy.

    See the fields in Parts
  2. Open Assembly

    Set the assembly and revision in B4:B5, costing date in B6, batch quantity in B7, and per-unit labor/overhead in B8:B9. Replace component inputs in rows 14–63.

    See the fields in Assembly
  3. Open Revisions

    Save a dated workbook copy before changing prices or design. Record the revision and reason in the manual history, then review cost and input warnings.

    See the fields in Revisions

Amber: your entries. Type your information here.

Green: calculated results. Keep these formulas.

Status colors can change as you work. Use the field instructions below to confirm what you can edit.

Follow along in your copy

Try the example in Assembly.

The workbook already contains illustrative records so you can see how it works. Find these cells, make a small change following the first steps, and review the result before entering your own information.

A few cells to find

AssemblyCell B4
Desk organizer
RevisionCell B5
R1
Costing dateCell B6
Oct 29, 2026
Batch quantityCell B7
10
Labor per unitCell B8
$8.00

These are sample values. Replace or clear the amber example cells before relying on your totals.

Bill of Materials & Batch Costing: the Assembly tab with illustrative sample dataOpen the worksheet preview
Assembly. The download also includes a Start here instruction tab.

New to spreadsheets?

A few things that make it easier.

Save your own copy

Use File > Save As in Excel. Keep the original workbook for next time.

Tabs and cells

Click a tab at the bottom to open it. B7 means column B, row 7.

Type and move

Click an amber cell, type, and press Enter. Press Tab to move right.

Choose a dropdown

Use the arrow on a validated cell to choose one of the listed options.

Dates and amounts

Use real dates and numeric amounts. Enter 50% for half. Keep the existing formats.

Undo a mistake

Use Ctrl+Z on Windows or Command+Z on Mac. Keep formulas, which start with =.

Keep this beside your workbook

What goes where.

01

Assembly

Set the product revision and batch size; enter component quantities and review batch cost.

Fields in Assembly. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Assembly (B4)Product or assembly being costed. One assembly per saved workbook.
Revision (B5)Design revision represented by the current component list.
Costing date (B6)Date these prices and assumptions were reviewed.
Batch quantity (B7)Positive whole number of finished assemblies to make.
Labor per unit (B8)USD labor allowance per finished assembly; enter 0 for none.
Overhead per unit (B9)USD overhead allowance per finished assembly; enter 0 for none.
Component code (A14)Choose a unique part code from Parts. Repeated component lines are allowed and sum into cost.
Quantity per assembly (D14)Nominal component requirement before the scrap allowance.
Scrap allowance (E14)Extra quantity as a percentage of nominal quantity, not a yield-loss denominator.
Required for batch (F14)Nominal quantity × (1 + allowance) × batch size. Whole issue policy rounds up after multiplying the batch.
02

Parts

Maintain 100 unique part codes, descriptions, units, prices, issue policies, and suppliers.

Fields in Parts. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Part code (A8)Unique identifier. Duplicate codes flag every matching row.
Description (B8)Name shown in the assembly list.
Unit (C8)Unit in which quantity and price are expressed, such as each, m, or kg.
Unit cost (D8)Nonnegative USD per listed unit; enter 0 for a confirmed free part.
Issue policy (E8)Whole rounds batch requirements up to an integer; Fractional retains decimal quantity.
Supplier (F8)Optional supplier or source reference.
03

Revisions

Record 20 dated revisions manually; this is a history log, not an automatic snapshot archive.

Fields in Revisions. Cell references match the prepared workbook; the instructions identify inputs and calculated results.
Field and cellsWhat to do
Revision (A8)Unique revision reference.
Date (B8)Date of the change.
Changed by (C8)Person responsible for the revision.
Reason (D8)Describe what changed and why.

Make it part of your routine

Everyday use & common fixes.

Replace the examples

All populated records are fictional. Replace or clear amber examples before using totals.

Prepared capacity

One single-level assembly, 50 component lines, 100 parts, and 20 revision entries. USD. No nested subassembly expansion, live prices, inventory depletion, purchasing automation, or saved-revision snapshots.

Blank or zero?

Leave unknown values blank. Enter 0 for a confirmed zero. Read missing-input messages before using a result.

More records

Beyond prepared capacity, extend formulas, validation, summary ranges, and chart ranges together.