Skip to content
GRID/MORI
Bag0

Operations / The GridMori collection

Excel .xlsx · 3 worksheets

Bill of Materials & Batch Costing

Cost one assembly with 50 component lines, 100 reusable part prices, scrap allowances, whole-unit rounding, labor, overhead, and revision history.

  • 50 component lines and 100 reusable parts
  • Scrap allowances and whole-unit rounding
  • Material, labor, and overhead cost roll-up
$9 USDOne-time purchase.
Yours to keep.

Choose any 3 templates for $24 or any 5 for $32.

Excel .xlsx download after payment. Tax calculated at checkout.

Editable formulasSample data includedNo macros

Bill of Materials & Batch Costing at a glance

Price
$9 USD, one time, before tax.
Intended user
Small manufacturers, makers, and operations teams costing a repeatable assembly.
Compatibility
Editable .xlsx for modern Microsoft Excel on Windows or Mac. No VBA macros. Other spreadsheet apps require import and review of formulas, charts, dropdowns, and layout.
Capabilities
50 component lines and 100 reusable parts; Scrap allowances and whole-unit rounding; Material, labor, and overhead cost roll-up; 20-entry manual revision history.
Limitations
One single-level assembly, 50 component lines, 100 parts, and 20 revision entries. USD. No nested subassembly expansion, live prices, inventory depletion, purchasing automation, or saved-revision snapshots.
Purchase terms
USD, one-time payment. No subscription. Choose any 3 different templates for $24 or any 5 for $32. One or two templates cost $9 each; 3–4 cost $8 each; 5 or more cost $6.40 each. Mix any categories; the discount applies automatically to every workbook in the bag. Extra copies of the same template do not unlock a tier. Taxes are calculated at checkout. Download after successful payment, with account purchase history when signed in. Personal commercial use in your own business is included. Resale and redistribution of the template files are not permitted.

Link to these template facts · Compare the full collection · Markdown summary

Show me how to use it: read the full beginner guide

Using Google Sheets? Follow the Excel-to-Google-Sheets conversion guide. This purchase currently delivers an Excel file; a hosted Google Sheets copy is not included.

A clearer way to work

Know the parts and cost of each build.

Build a single-level bill of materials from reusable part prices. Enter a batch quantity, include a scrap allowance, and compare material, labor, overhead, and total batch cost before starting production.

Made for

Small manufacturers, makers, and operations teams costing a repeatable assembly.

01

50 component lines and 100 reusable parts

02

Scrap allowances and whole-unit rounding

03

Material, labor, and overhead cost roll-up

04

20-entry manual revision history

One connected workbook

Take a look inside.

Start with the included guide, replace the example inputs, and review the calculated results.

01

Assembly

Set the product revision and batch size; enter component quantities and review batch cost.

02

Parts

Maintain 100 unique part codes, descriptions, units, prices, issue policies, and suppliers.

03

Revisions

Record 20 dated revisions manually; this is a history log, not an automatic snapshot archive.

Bill of Materials & Batch Costing: detailed view of the Parts worksheetExplore the details
Parts · Preview with illustrative sample data

From download to your daily work

A useful start in three steps.

  1. 01

    Parts: Replace examples in A8:F107. Each part needs a unique code, unit cost, and Whole or Fractional issue policy.

  2. 02

    Assembly: Set the assembly and revision in B4:B5, costing date in B6, batch quantity in B7, and per-unit labor/overhead in B8:B9. Replace component inputs in rows 14–63.

  3. 03

    Revisions: Save a dated workbook copy before changing prices or design. Record the revision and reason in the manual history, then review cost and input warnings.

The useful details

Before you make it yours.

How do scrap and whole-unit rounding affect the cost?

Required quantity is nominal quantity per assembly × (1 + scrap allowance) × batch size. Whole issue policy rounds that batch quantity upward; Fractional preserves decimals. Each batch line cost rounds to cents. Changing a reusable part price updates the current assembly; save a dated copy to preserve an earlier estimate.

What will I receive after purchase?

You receive the complete Bill of Materials & Batch Costing as an editable .xlsx file with 3 worksheets, sample data, and live formulas. Your paid order confirmation includes download links. Sign in to your GridMori account to keep purchased workbooks together in your library.

Do I need a subscription?

No. This workbook is a one-time $9 purchase. Choose any 3 different GridMori templates for $24 or any 5 for $32. Your bag applies $8-each pricing for 3–4 templates and $6.40-each pricing for 5 or more. Taxes are calculated at checkout.

Which spreadsheet app is it designed for?

Editable .xlsx for modern Microsoft Excel on Windows or Mac. No VBA macros. Other spreadsheet apps require import and review of formulas, charts, dropdowns, and layout.

Can I customize the workbook for my business?

Yes. Replace the example data, edit the input fields, and adapt the labels and appearance for your own work. Keep an original copy and check formulas and chart ranges when extending the prepared structure. A personal commercial-use license is included; it does not permit resale of the template.